PREVENTIVE AVALANCHE RELEASE

WYSSEN AVALANCHE TOWER LS12-5 AND LS24-5
Thanks to the large effective range produced by a big explosive detonated above the snow cover, the Wyssen Avalanche Towers are most applicable for large starting zones.

WYSSEN MINI AVALANCHE TOWER LS6-5
For triggering safely accessible and not very remote avalanche starting zones. The Mini Avalanche Tower can be reloaded manually and contains 6 charges for preventive avalanche triggering.
WYSSEN 2K® CHARGE
Unlike traditional explosive charges the Wyssen 2K® becomes explosive material only moments before use.
CHARGE 07
The explosive charge consists of two orange half-shells with pre-mounted SZ 83 percussion fuse, which are assembled with 4-5kg of explosives. The charge containers are assembled by the operator on site.
WYSSEN BOMB TRAMWAY
The charges are transported from a station to the avalanche starting zone and then detonated above the snow cover.
WYSSEN CHARGE CARRIER LA2-5 / LA4-5
The charge carrier for 2 or 4 charges improves the efficiency of blasting cableways.